A five-acre public park is proposed for The Mile in Tysons. Plans filed by Link Logistics show a large lawn, playground, concert stage, cafe, sports courts and food-truck area at 7925 Jones Branch Drive.
The design is detailed, but the park is not approved, funded or under construction. Fairfax County staff had not accepted the filing for formal review as of July 22.
Signature Park at The Mile: Quick facts
What is proposed for The Mile’s Signature Park?
Link Logistics filed a detailed development plan for the central park promised as part of The Mile, the large redevelopment of the former ExxonMobil campus in Tysons.
The proposal organizes the site around a broad lawn and a series of smaller activity spaces. Paths and terraces would connect the park to nearby buildings and the future Tysons Community Circuit.
What amenities are planned?
36,000-square-foot lawn
The largest open space is designed for everyday use and community events. Filed plans show room for flexible seating and gatherings.
Playground and sports courts
A 16,000-square-foot playground and two sports pitches would give the park active recreation space for children and adults.
Stage and plaza
A 4,250-square-foot plaza and stage could host concerts and programmed events. The schedule and operator have not been decided.
Cafe and food trucks
The plan includes a 1,040-square-foot cafe, outdoor seating and a separate area where food trucks could park.
Where would Signature Park be in Tysons?
The site is at 7925 Jones Branch Drive, inside The Mile development near the Capital Beltway. The broader property is being rebuilt with housing, offices, shops and public spaces.
Fairfax County has long identified a major public park as part of this section of Tysons. The proposed design would put that park near new development while tying it into a larger walking and biking loop.
Is Signature Park approved?
No. The plan has been filed, but county staff have not accepted it for formal review. That means detailed agency comments, revisions and public decisions are still ahead.
Proposed, not under construction
The drawings show what Link Logistics wants to build. They do not establish a construction date, operating schedule or final list of amenities.
When could the Tysons park open?
No opening date has been announced. The county first needs to accept and review the application, and the applicant may revise the design in response to staff comments.
Funding, permits, construction sequencing and the pace of development around The Mile will also affect the timeline. The next reliable update will come when Fairfax County formally accepts the plan or publishes review comments.
See more Northern Virginia neighborhood and development coverage from DC Spot.
Frequently asked questions about Signature Park at The Mile in Tysons
What is Signature Park at The Mile?
Signature Park is a proposed five-acre public park at The Mile development in Tysons, Virginia.
Where would the Tysons Signature Park be located?
The proposed park site is at 7925 Jones Branch Drive within The Mile development in Tysons.
What would the park include?
Filed plans show a 36,000-square-foot lawn, 16,000-square-foot playground, stage and plaza, two sports pitches, a small cafe, food-truck space and terraces.
Has Fairfax County approved Signature Park?
No. The plan has been filed, but Fairfax County staff had not accepted it for formal review as of July 22, 2026.
When will Signature Park open?
No construction or opening date has been announced. The proposal still needs county review and later approvals.
Will the park connect to walking and biking routes?
The proposal is designed to connect with nearby paths and the planned Tysons Community Circuit.
Feature image courtesy Dclemens1971 via Wikimedia Commons, CC BY 4.0.
Last updated July 22, 2026. The proposed amenities and dimensions were checked against the filed plan and local reporting. Fairfax County has not accepted the application for formal review.



